Go to the Equipment Summary page in CAPCOST (far left tab at bottom). Because it may be necessary to start over, it is also a good idea to rename the file each time you save it, e.g., acetone1.xls, acetone2.xls, acetone3.xls, etc. Save often while working, as there have sometimes been bugs in CAPCOST that can cause problems. Note that its macros must be operational. Also find the current salary + benefits for operators (). Find the current costs of industrial quantities of your raw materials, products, electricity, natural gas, and fuel oil using the sources given at Note that CAPCOST requires utility costs in $/GJ. Find the latest value of the Chemical Engineering Chemical Plant Index (CEPCI) at the end of the latest issue of Chemical Engineering ( Magazine): TP1.C3. Liquids must be above their freezing points and below their. Note that these must all be above 1-atm pressure.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |